05/01/2023 | A RESOLUTION OF THE HARDYSTON TOWNSHIP MUNICIPAL UTILITIES AUTHORITY AUTHORIZING ACCEPTANCE OF SANITARY SEWER AND WATER SYSTEM EASEMENTS FOR “THE TARN” PROJECT FROM CRYSTAL SPRINGS BUILDERS, L.L.C. |
05/01/2023 | A RESOLUTION OF THE HARDYSTON TOWNSHIP MUNICIPAL UTILITIES AUTHORITY AUTHORIZING THE EXECUTION OF A SERVICE AGREEMENT WITH THE DEPARTMENT OF COMMUNITY AFFAIRS IN CONNECTION WITH THE LOW INCOME HOUSEHOLD WATER ASSISTANCE PROGRAM (“LIHWAP’) |
04/03/2023 | ASSISTANCE TO HARDYSTON TOWNSHIP IN CONNECTION WITH THE TOWNSHIP’S ISSUANCE OF A REQUEST FOR BIDS PURSUANT TO N.J.S.A. 40:62-1 et. seq., IN CONNECTION WITH THE WATERS SUPPLY, TREATMENT, STORAGE, AND DISTRIBUTION SYSTEM AND THE WASTEWATER COLLECTION SYSTEM |
04/03/2023 | RESOLUTION RATIFYING THE PAYMENT TO IPE RIGGING CORP FOR THE EMEGENCY REPAIR OF A TANK COVER FABRICATION AND INSTALLATION |
01/09/2023 | RESOLUTION RATIFYING THE PAYMENT TO SREC RESOURCES, INC FOR THE EMERGENCY REPAIR OF A GENERATOR TRANSFER SWITCH |
01/09/2023 | RESOLUTION TO AMEND THE 2022 CAPITAL BUDGET |
01/09/2023 | RESOLUTION AUTHORIZING THE EXECUTION OF CERTAIN SHARED SERVICE AGREEMENTS WITH THE TOWNSHIP OF HARDYSTON |
01/09/2023 | RESOLUTION AUTHORIZING THE EXECUTION OF A SHARED SERVICE AGREEMENT WITH THE TOWNSHIP OF SPARTA FOR THE PROVISION OF CHIEF FINANCIAL OFFICER SERVICES |
11/07/2022 | RESOLUTION RATIFYING THE PAYMENT TO FSC LEAK DETECTION FOR THE EMERGENCY REPAIR OF A LEAK AT THE PARK DRIVE FIRE PROTECTION SYSTEM |
09/12/2022 | 2022 AUTHORITY BUDGET RESOLUTION |
09/12/2022 | A RESOLUTION OF THE BOARD OF COMMISSIONERS OF THE HARDYSTON TOWNSHIP MUNICIPAL UTILITIES AUTHORITY AUTHORIZING CHANGES TO THE WATER AND WASTEWATER SERVICE RATES PURSUANT TO AND IN ACCORDNACE WITH N.J.S.A. 40:14B-1 et. seq |
08/01/2022 | RESOLUTION AUTHORIZING CERTAIN PROFESSIONAL SERVICE CONTRACT FOR 2022 |
06/06/2022 | A Resolution to Introduce the Authority Budget for Fiscal Year 2023 After the July 1, 2022 Due Date |
05/18/2022 | RESOLUTION RATIFYING THE PAYMENT TO NORTH JERSEY PUMP & CONTROLS, LLC FOR THE EMEGENCY REPLACEMENT OF CRYSTAL SPRINGS ROAD SEWER PUMP NUMBER 2 |
04/06/2022 | RESOLUTION AUTHORIZING THE ADOPTION AND IMPLEMENTATION OF NEW WATER RATES, BULK WATER RATES AND WATER SYSTEM CONNECTION FEES |
03/04/2022 | RESOLUTION RATIFYING THE PAYMENT TO BWC BUILDERS, LLC FOR THE EMEGENCY REPAIR OF ROOFING AND DOORS OF THE INDIAN FIELD AND CRSYSTAL SPRINGS PUMP HOUSES |
12/06/2021 | A RESOLUTION OF THE HARDYSTON TOWNSHIP MUNICIPAL UTILTIES AUTHORITY AUTHORIZING AND CONFIRMING THE PERFORMANCE OF EMERGENCY SERVICES IN ACCORDANCE WITH N.J.S.A. 40A:11-6 |
12/06/2021 | RESOLUTION OF THE HARDYSTON TOWNSHIP MUNICIPAL UTILITIES AUTHORITY AUTHORIZING THE EXECUTION OF AN AGREEMENT BY AND BETWEEN HARDYSTON TOWNSHIP AND THE HARDYSTON TOWNSHIP MUNICIPAL UTILITIES AUTHORITY CONCERNING THE TRANSFER OF SETTLEMENT FUNDS ASSOCIATED WITH CERTAIN PERFORMANCE GUARANTEES |
11/01/2021 | RESOLUTION AUTHORIZING THE EXECUTION OF A THIRD PARTY ENERGY SUPPLY CONTRACT WITH DIRECT ENERGY |
10/06/2021 | STATEWIDE INSURANCE FUND – RESOLUTION TO JOIN (RENEW) THE FUND |
09/13/2021 | A RESOLUTION OF THE HARDYSTON TOWNSHIP MUNICIPAL UTILTIES AUTHORITY AUTHORIZING ACCEPTANCE OF SANITARY SEWER AND WATER SYSTEM EASEMENTS FOR “THE OAKS” ALSO REFERRED TO AS “OAKS EAST” PROJECT FROM CYRSTAL SPRINGS BUILDERS, L.L.C. |
09/13/2021 | A RESOLUTION OF THE HARDYSTON TOWNSHIP MUNICIPAL UTILTIES AUTHORITY AUTHORIZING ACCEPTANCE OF SANITARY SEWER AND WATER SYSTEM EASEMENTS FOR “THE WENTWORTH” PROJECT FROM CYRSTAL SPRINGS BUILDERS, L.L.C. |
07/12/2021 | A RESOLUTION TO INTRODUCE THE AUTHORITY BUDGET FOR FISCAL YEAR 2022 AFTER THE JULY 1,2021 DUE DATE |
06/07/2021 | HARDYSTON TOWNSHIP MUNICIPAL UTILITIES AUTHORITY AUTHORIZING THE EXECUTION OF AN AGREEMENT BY AND BETWEEN THE HARDYSTON TOWNSHIP MUNICIPAL AUTHORITY, HARDYSTON TOWNSHIP, AND THE BOROUGH OF SUSSEX |
04/05/2021 | A RESOLUTION OF THE HARDYSTON MUNICIPAL UTILITIES AUTHORITY AUTHORIZING RELEASE OF THE BEAZER HOMES, LLC ESCROWS HELD BY THE AUTHORITY IN CONNECTION WITH THE INDIAN FIELD, PHASE III DEVELOPMENT |
01/04/2021 | RESOLUTION AUTHORIZING THE EXECUTION OF CERTAIN SHARED SERVICE AGREEMENTS WITH THE TOWNSHIP OF HARDYSTON |
12/07/2020 | A RESOLUTION OF THE HARDYSTON TOWNSHIP MUNICIPAL UTILTIES AUTHORITY ACKNOWLEDGING THAT A TWO-YEAR MAINTENANCE PERIOD HAS ELAPSED WITH RESPECT TO THE FACILITIES TRANSFERRED FROM BEAZER HOMES, LLC IN CONNECTION WITH THE INDIAN FIELD, PHASE III DEVELOPMENT |
11/02/2020 | Lein Waiver Resolution |
11/02/2020 | Emergency Repair Well #1 |
11/02/2020 | Emergency Remote Meeting Regulations Resolution |
09/14/2020 | Samuel Stothoff Co#3 Emergency |
09/14/2020 | North Church Tech Center |
09/14/2020 | Brave Change Order |
08/03/2020 | 2020 (2020-2021) ADOPTED BUDGET RESOLUTION |
08/03/2020 | AUTHORIZING AND CONFIRMING THE PERFORMANCE OF EMERGENCY SERVICES IN ACCORDANCE WITH N.J.S.A. 40A:11-6 |
07/06/2020 | Budget Presentation Resolution |
06/01/2020 | Semeraro Invoice Resolution |
04/06/2020 | Brave change order resolution |
04/06/2020 | Lam Dev Agreement – CS II |
02/03/2020 | Professional Service Contracts Resolution |
02/03/2020 | 2020 Statewide Insurance Resolution Appointing Fund Commissione |
02/03/2020 | Administrator Resolution |
02/03/2020 | Depositories Resolution |
02/03/2020 | Meeting Schedule – 2020 |
02/03/2020 | Newspapers -2020 |
02/03/2020 | Officers Resolution – 2020 |
02/03/2020 | Recording Secretary -2020 |
02/03/2020 | Risk Mgmt Resolution |
02/03/2020 | SIGNED AUDIT RESOLUTION |
02/03/2020 | SIGNED AUDIT REVIEW CERT |
01/06/2020 | HTMUA Energy Resolution |
01/06/2020 | 2019 Audit Resolution |
11/04/2019 | 2020 Shared Service Agreements Resolution |
11/04/2019 | Bourne Circle Emergency Repair |
11/04/2019 | CFO Shared Services Resolution |
10/07/2019 | Emergency Interconnect Agreement Bill of Sale |
09/09/2019 | 2019 Budget Adoption Resolution |
07/01/2019 | Amended Engineer Agreement Professional Service Resolution |
07/01/2019 | Budget Intro Resolution 2019-2020 |
04/02/2019 | Revisions Authoritys Rules Regs Attendance |
04/02/2019 | Emergency Generator Power Generator Services |
03/04/2019 | Award of Contract to Brave Industrial Paint Painting of CS Water Tank |
03/04/2019 | Execution Bill of Sale SMS |
03/04/2019 | Amend The 2019 FY Water Capital Budget.pdf |
02/04/2019 | 2019 Shared Service Agreements Resolution |
02/04/2019 | 2019 Election of Officers |
02/04/2019 | 2019 Election of Administrator |
02/04/2019 | 2019 Appointment of Risk Management Consultant |
02/04/2019 | 2019 Appointment of Recording Secretary |
02/04/2019 | 2019 Appointment of Official Newspapers |
02/04/2019 | 2019 Appointment of Official Depositories |
02/04/2019 | 2019 Adoption of meeting dates |
02/04/2019 | 2017-2018 Fixed Asset List Corrective Action |
01/07/2019 | 2019 Shared Service Agreements Resolution |
01/07/2019 | Annual On-Call Service Authorization to Solicit Bids |
01/07/2019 | Water Tank Painting Authorization to Solicit Bids |
01/07/2019 | 2018 Audit resolution |
11/05/2018 | TWA PERMIT APPLICATION RESOLUTION |
11/05/2018 | R R PUMP CONTROL CONTRACT RESOLUTION |
09/10/2018 | 2018 ADOPTED BUDGET RESOLUTION |
09/10/2018 | Resolution Creating Official Seal |
09/06/2018 | Statewide Insurance Fund 2019 Renwal Resolution and agreement |
08/06/2018 | 2018 Resolution Water Permit Extension Ardleigh and Shotmeyer Developments |
08/06/2018 | 2018 RESOLUTION EMERGENCY SERVICES – IPE RIGGING – CENTRAL PAINTING |
08/06/2018 | 2018 Resolution Authorizing EIT Bond |
08/06/2018 | 2018 Resolution AT&T Cell Tower Change Equi |
08/06/2018 | 2018 AUTHORITY BUDGET RESOLUTION |
05/07/2018 | Resolution to Amend the Rules Regs Bulk Water Rate |
03/05/2018 | Emergency Generator Contract Power Generator Correction |
02/05/2018 | Recording Secretary |
02/05/2018 | 2017 Audit Resolution |
02/05/2018 | 2018 Administrator Resolution |
02/05/2018 | 2018 Bank Depositories Resolution |
02/05/2018 | 2018 HTMUA Officers Resolution |
02/05/2018 | 2018 HTMUA Resolution to Appoint Fund Commissioner |
02/05/2018 | 2018 Meeting Schedule Resolution |
02/05/2018 | 2018 Official Newspaper Resolution |
02/05/2018 | 2018 Professional Service Contracts Resolution |
02/05/2018 | 2018 Risk Management Resolution |
02/05/2018 | Asset Managment Plan Professional Service Contract Resolution |
02/05/2018 | Shared Service Agreements Resolution |
—– | |
12/04/2017 | RESOLUTION AUTHORIZING THE EXECUTION OF AN AGREEMENT BETWEEN RIVERDALE QUARRY COMPANY, INC., THE TOWNSHIP OF HARDYSTON AND THE HARDYSTON TOWNSHIP MUNICIPAL UTILITIES AUTHORITY FOR COMPLETION AND TRANSFER OF THE FIRE SUPPRESSION SYSTEM IN THE NORTH CHURCH TECHNICAL CENTER AND SATISFACTION OF ALL OBLIGATIONS UNDER THE 1990 AGREEMENT BETWEEN THE AUTHORITY AND RIVERDALE QUARRY COMPANY, INC. |
11/06/2017 | Revisions to Rules & Regulations |
10/02/2017 | Bond Counsel Agreement |
09/19/2017 | Budget Adoption |
09/19/2017 | Revolving Repair Fund |
08/07/2017 | Budget Introduction |
08/07/2017 | Shared Service Agreements |
06/05/2017 | Beazer Homes |
04/03/2017 | Fixed Asset List Corrective Action |
04/03/2017 | Emergency Contract Award Corrective Action |
03/05/2017 | Emergency Generator Service |
02/06/2017 | Appointment of Recording Secretary-Utility Billing |
02/06/2017 | Professional Engineer – Guerin – Vreeland |
02/06/2017 | Professional Attorney – DeCottis |
02/06/2017 | Professional Accountant – Ferraioli |
02/06/2017 | Official Newspapers |
02/06/2017 | Financial Institutions |
02/06/2017 | Election of Officers |
02/06/2017 | Appointment of Administrator |
02/06/2017 | Annual Meeting Schedule |
01/09/2017 | Authorizing Conveyance Phase III- Indian Fields |
01/09/2017 | CFO – Interlocal – Sparta Twp |
—– | |
| 2016 Audit Summary Synopsis |
| 2016 Annual Audit Resolution |
—– | |
11/07/2016 | Shotmeyer ByPass Crystal Springs |
11/07/2016 | Appointment of Treasurer |
10/03/2016 | Well#3-Development-Cleaning |
09/12/2016 | PULL PUMP #2 CRYSTAL SPRINGS |
07/19/2016 | LATE BUDGET FILING RESOLUTION |
07/19/2016 | LATE BUDGET FILING RESOLUTION |
02/01/2016 | A RESOLUTION OF THE HARDYSTON TOWNSHIP MUNICIPAL UTILTIES AUTHORITY AWARDING MAINTENANCE AND SERVICE CONTRACT TO POWER GENERATOR SERVICES, LLC, FOR THE YEAR 2016
|
02/01/2016 | A RESOLUTION OF THE HARDYSTON TOWNSHIP MUNICIPAL UTILTIES AUTHORITY PROVIDING FOR THE APPOINTMENT OF A RECORDING SECRETARY, AND A UTILITY BILLING SPECIALIST
|
02/01/2016 | A RESOLUTION OF THE HARDYSTON TOWNSHIP MUNICIPAL UTILTIES AUTHORITY ESTABLISHING THE ANNUAL MEETING SCHEDULE FOR THE PERIOD MARCH 2016 THROUGH FEBRUARY 2017 |
02/01/2016 | A RESOLUTION OF THE HARDYSTON TOWNSHIP MUNICIPAL UTILTIES AUTHORITY PROVIDING FOR THE APPOINTMENT OF AN ADMINISTRATOR |
02/01/2016 | A RESOLUTION OF THE HARDYSTON TOWNSHIP MUNICIPAL UTILTIES AUTHORITY DESIGNATING CERTAIN FINANCIAL INSTITUTIONS AS THE OFFICIAL DEPOSTIORIES FOR THE MONIES OF THE AUTHORITY IN ACCORDANCE WITH N.J.S.A. 40A:5-14 FOR THE YEAR 2016 |
02/01/2016 | A RESOLUTION OF THE HARDYSTON TOWNSHIP MUNICIPAL UTILTIES AUTHORITY DESIGNATING THE AUTHORITY’S OFFICIAL NEWSPAPERS |
02/01/2016 | A RESOLUTION OF THE HARDYSTON TOWNSHIP MUNICIPAL UTILTIES AUTHORITY PROVIDING FOR THE ELECTION OF OFFICERS |
02/01/2016 | HARDYSTON TOWNSHIP MUNICIPAL UTILITES AUTHORITY RESOLUTION AUTHORIZING CONTRACT WITH GUERIN & VREELAND ENGINEERING. INC. ROBERT P. GUERIN & MICHAEL VREELAND |
02/01/2016 | HARDYSTON TOWNSHIP MUNICIPAL UTITLITIES AUTHORITY RESOLUTION AUTHORIZING CONTRACT WITH FERRAIOLI, WIELKOTZ, CERULLO & CUVO, P.A. FOR PROFESSIONAL SERVICES |
02/01/2016 | HARDYSTON TOWNSHIP MUNICIPAL UTILITIES AUTHORITY RESOLUTION AUTHORIZING CONTRACT WITH RYAN J. SCERBO, ESQ. OF DECOTIS, FITZPATRICK & COLE, LLP FOR PROFESSIONAL SERVICES |
12/07/2015 | Performance Security Crystal Springs |
11/02/2015 | Resolution Authorizing Guerin Vreeland Renewal of Water Allocation Permit |
09/14/2015 | IF Performance Security Call Up |
09/14/2015 | ATT Lease Amendment |
09/14/2015 | Resolution Meter Reading Equipment |
09/15/2015 | 2015 Adopted Budget Resolution |
07/14/2015 | Electrical Improvements Tannery Hill Pump |
07/14/2015 | Communication System Improvement |
07/06/2015 | IF Temporary Access Agreement |
07/06/2015 | Nextera 3rd Party Energy Contract |
07/06/2015 | Auto Transfer Switch IF |
07/06/2015 | Resolution Shared Services |
07/06/2015 | 2016 Late Filing Budget |
07/06/2015 | Indian Field Transfer Switch Repair |
06/01/2015 | Generator – Sugar Maple Pump Station |
03/02/2015 | Resolution Risk Management Consultant |
03/02/2015 | Resolution of Annual Audit |
03/02/2015 | Resolution Guerin & Vreeland |
03/02/2015 | Resolution Ferraioli Wielkotz Cerullo Cuva |
03/02/2015 | Resolution Decotis Fitzpatrick Cole |
03/02/2015 | Summary of Synopsis Audit 2014 |
11/03/2014 | Crystal Springs Bourne Conveyance |
10/06/2014 | Fixed Asset List Corrective Action |
08/04/2014 | Rules Change |
07/07/2014 | Budget Late Filing Resolution |
05/05/2014 | Official Payments Resolution |
01/06/2014 | Resolution Regarding Assignment of Agreement to Crystal Springs Site Development |
01/06/2014 | Approval of Lease Amendment Agreement with AT&T |
01/06/2014 | Resolution regarding Legal Representation |
01/06/2014 | Resolution Regarding Shares Services Agreements with Hardyston Township |
01/06/2014 | Resolution Authorizing Contract with Ferraioli, Wielkotz, Cerullo & Cuvo, P.A. for Professional Services |
01/06/2014 | Resolution Authorizing Contract with Guerin & Vreeland Engineering. Inc. Robert P. Guerin & Michael Vreeland |
01/06/2014 | Resolution Authorizing Contract with Mark Hontz, esq. of Hollander, Strelzik, Pasculli, Hinkes, Vandenberg & Hontz, LLC for Professional Services |
01/06/2014 | Approval of Shared Services Agreement with Sparta for CFO |
01/06/2014 | Pump Purchase |
01/06/2014 | Approval of Agreement with Hardyston and Sussex |
01/06/2014 | Appointment of Vice-Chairman |
12/02/2013 | Sewerage Agreement Execution |
10/07/2013 | Confirmation of Accounts of 19 Indian Field Drive and 9 Clubhouse Road |
10/07/2013 | Release of Maintenance Bond |
09/09/2013 | Expenditure for Pump Repair in Crystal Springs |
09/09/2013 | Expenditure for Road Upgrades |
07/01/2013 | Adoption of Shared Services Agreements |
07/01/2013 | Authorization for Hydrant Use by Hardyston Township |
07/01/2013 | Purchase of Valve Exerciser – Modification |
07/01/2013 | Demand for Manhole Repair |
07/01/2013 | Unauthorized Use of Hydrant |
07/01/2013 | Release Maintenance Bond |
06/03/2013 | Revocation of Sewerage Allocation |
06/03/2013 | Release of Bond Hovnanian |
05/06/2013 | Discontinuation of Courtesy Tenant Billing |
05/06/2013 | Purchase of MSI Software |
05/06/2013 | Revocation Hearing for Beaver Run |
04/22/2013 | Approval to Sign Water Main Extension Permits |
03/04/2013 | Indian Field Well #2 Investigation |
03/04/2013 | Authorization of Bond Status Investigation |
03/04/2013 | Denial of Release of Maintenance Bond |
02/04/2013 | Analysis of Crystal Springs Pump Capacity |
03/04/2013 | Purchase of Truck Resolution |
03/04/2013 | Resolution Authorizing Contract with Ferraioli, Wielkotz, Cerullo & Cuvo, P.A. for Professional Services |
03/04/2013 | Resolution Authorizing Contract with Guerin & Vreeland Engineering. Inc. Robert P. Guerin & Michael Vreeland |
03/04/2013 | Resolution Authorizing Contract with Mark Hontz, esq. of Hollander, Strelzik, Pasculli, Hinkes, Vandenberg & Hontz, LLC for Professional Services |
01/07/2013 | A Resolution Consenting to the Proposed Water Quality Management (WQM) Plan Amendment Entitled: Sussex County Water Quality Management Plan |
01/07/2013 | Audit Review |
—– | |
09/10/2012 | Rate Changes for Water Rate and Sewer Rate, Effective December 1, 2012 |
10/01/2012 | Agreement between Riverdale Quarry Co, Inc., Hardyston Township and HTMUA |
12/03/2012 | Adjustment of Water Bill |
12/03/2012 | Payment of Plumbing Bill for Customer |
12/03/2012 | Indian Field Waterspheroid Rehabilitation Final Payment to Allied Painting, Inc. |